72345 - CHA Taxiway A Rehab, Connector & Apron Construction

The project consists of rehabilitation of approximately 1,300 linear feet of existing taxiway, the construction of an approximately 700 feet of new taxilane, 9,500 SY of reconstructed apron, and 7,000 SY of new apron for future hangar development. The scope encompasses all erosion control, storm drainage installation, earthwork embankment, fine grading, asphalt milling and removal, asphalt paving, electrical lighting and signage, pavement markings, turfing and other related work as shown on the drawings and/or in the specifications.
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum No. 1 - 72345 10.3 MB
Addendum No. 2 - 72345 6.6 MB
Addendum No. 3 - 72345 8.2 MB
Addendum No. 4 - 72345 5.4 MB