72346 - CHA West Side Apron Construction

The project consists of construction of 11,200 SY of new pavement apron and a 325 LF taxiway connector with site preparation for future hangar development. The scope encompasses all erosion control, storm drainage installation, earthwork embankment, fine grading, asphalt pavement construction, electrical lighting and signage, pavement markings, turfing and other related work as shown on the drawings and/or in the specifications.
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum No. 1 - 72346 3.5 MB
Addendum No. 2 - 72346 657.0 KB