63273 - DCS Lewisburg High School Band Addition

The project consists of constructing a new 5,700 SF Band Hall addition attached to the existing school building. The new facility will include all associated site work which includes grading, paving, drainage, utilities, and other related work as shown on the drawings and/or described in the specifications.
Addenda (click to expand/collapse)
Any addenda to the plans and/or specifications issued before or during the time of bidding will become a part of the Contract and receipt of same must be acknowledged by Bidder in his proposal.
Download section as a Zip file free of charge
Name Size
Addendum No. 1 7.3 MB
Addendum No. 2 - 63273 495.0 KB