62690 - SCS Bellevue HVAC Equipment Replacement
The scope of the project includes the replacement of 32 unit ventilators, one boiler, 4 heating only unit ventilators, 6 fan coil units, 10 air handlers, one chiller, one cooling tower, one condensing unit, and all associated controls work.”
Bid Documents
(click to expand/collapse)

FOR VIEWING AND DOWNLOADING PURPOSES ONLY
Name | Size | ||
001 ME0.1 | 314.6 KB | ||
002 ME0.2 | 314.2 KB | ||
003 ME0.3 | 314.2 KB | ||
004 ME0.4 | 272.0 KB | ||
005 ME1.1 | 441.3 KB | ||
006 ME1.2 | 415.0 KB | ||
007 ME1.3 | 432.7 KB | ||
008 ME1.4 | 316.4 KB | ||
009 ME2.1 | 840.0 KB | ||
010 ME3.1 | 296.9 KB | ||
011 ME3.2 | 252.5 KB | ||
012 E1.1 | 445.5 KB | ||
013 E1.2 | 426.3 KB | ||
014 E1.3 | 412.1 KB | ||
015 E1.4 | 264.8 KB |